{"id":25047,"date":"2025-12-08T07:13:39","date_gmt":"2025-12-08T07:13:39","guid":{"rendered":"https:\/\/gtracademy.org\/?p=25047"},"modified":"2025-12-08T07:16:44","modified_gmt":"2025-12-08T07:16:44","slug":"sap-ewm-pm-integration-streamlining-goods","status":"publish","type":"post","link":"https:\/\/gtracademy.org\/staging\/sap-ewm-pm-integration-streamlining-goods\/","title":{"rendered":"SAP\u200b\u200d\u200b\u200c\u200d\u200b\u200d\u200c\u200b\u200d\u200b\u200c\u200d\u200b\u200d\u200c EWM + PM Integration: Streamlining Goods Issue for Maintenance Orders Best\u00a02025"},"content":{"rendered":"<h2><span data-contrast=\"none\">Why SAP EWM and PM Must Work Together?<\/span><span data-ccp-props=\"{&quot;134245418&quot;:true,&quot;134245529&quot;:true,&quot;335559738&quot;:160,&quot;335559739&quot;:80}\">\u00a0<\/span><\/h2>\n<p><span data-contrast=\"auto\">Plant Maintenance (SAP PM) and Extended Warehouse Management (SAP EWM) are the two critical departments that must be in harmony for the success of the sectors, SAP\u200b\u200d\u200b\u200c\u200d\u200b\u200d\u200c\u200b\u200d\u200b\u200c\u200d\u200b\u200d\u200c EWM + PM Integration industrial complex manufacturing, and asset-intensive industries. Spare parts, tools, and kits are the necessary items for the maintenance teams, so they have to be granted an uninterrupted access, while the warehouse teams continuously juggle inventory, picking, packing, and issuing materials in a flawless manner, <a href=\"https:\/\/gtracademy.org\/sap-ewm-online-training-with-certification\/\"><strong>SAP<\/strong><\/a><\/span><strong>\u200b\u200d\u200b\u200c\u200d\u200b\u200d\u200c\u200b\u200d\u200b\u200c\u200d\u200b\u200d\u200c EWM + <a href=\"https:\/\/gtracademy.org\/sap-tm-training-master-s-4hana-course\/\">PM Integration<\/a>.<\/strong><\/p>\n<p><span data-contrast=\"auto\">The link between SAP EWM and SAP PM opens the way for a friendly interaction between maintenance orders and warehouse logistics. It is basically a flow from order creation to goods issue, which helps to ensure that the right materials meet the right place at the right time without the intervention of the human factor and without mistakes or delays.<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">At<a href=\"https:\/\/gtracademy.org\/\"> <strong>GTR Academy<\/strong><\/a>, we sharpen the skills of SAP integration experts, thereby, giving them the ability to MRO (Maintenance, Repair, and Operations) workflow optimization and plant downtime reduction.<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<p><strong><span style=\"font-size: 18pt;\">Connect With Us:<a href=\"https:\/\/api.whatsapp.com\/send\/?phone=919650518049&amp;text=Hi%2C%20I%20want%20to%20know%20more%20about%20GTR%20academy%20courses\" target=\"_blank\" rel=\"noopener\"><span style=\"color: #339966;\"> WhatsApp<\/span><\/a><\/span><\/strong><\/p>\n<div class=\"entry-content-asset videofit\"><iframe title=\"GTR Academy | SAP EWM-PM Integration Training | Goods Issue for Maintenance Orders\" width=\"720\" height=\"405\" src=\"https:\/\/www.youtube.com\/embed\/FdDNzQc_XP8?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe><\/div>\n<h2 aria-level=\"2\"><span data-contrast=\"none\">Challenge: Common Pain Points in EWM-PM Integration<\/span><span data-ccp-props=\"{&quot;134245418&quot;:true,&quot;134245529&quot;:true,&quot;335559738&quot;:160,&quot;335559739&quot;:80}\">\u00a0<\/span><\/h2>\n<p><span data-contrast=\"auto\">The absence of a proper integration between the hard and software systems can slow down the operational nitty-gritty progressively in all levels and departments of a corporation. Now, let me briefly describe the typical scenarios and situations when things take a turn for the worse:<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<ol>\n<li aria-setsize=\"-1\" data-leveltext=\"%1.\" data-font=\"\" data-listid=\"3\" data-list-defn-props=\"{&quot;335552541&quot;:0,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769242&quot;:[65533,0],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;%1.&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" data-aria-posinset=\"1\" data-aria-level=\"1\"><span data-contrast=\"none\">MRO Inventory Mismanagement<\/span><span data-ccp-props=\"{&quot;134245418&quot;:true,&quot;134245529&quot;:true,&quot;335559738&quot;:160,&quot;335559739&quot;:80}\">\u00a0<\/span><\/li>\n<\/ol>\n<p><span data-contrast=\"auto\">On many occasions, maintenance teams are confused when it comes to finding the location of parts or making a reservation of them in a warehouse that is under the management of EWM.<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<ol>\n<li aria-setsize=\"-1\" data-leveltext=\"%1.\" data-font=\"\" data-listid=\"3\" data-list-defn-props=\"{&quot;335552541&quot;:0,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769242&quot;:[65533,0],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;%1.&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" data-aria-posinset=\"2\" data-aria-level=\"1\"><span data-contrast=\"none\">Manual Picking Errors<\/span><span data-ccp-props=\"{&quot;134245418&quot;:true,&quot;134245529&quot;:true,&quot;335559738&quot;:160,&quot;335559739&quot;:80}\">\u00a0<\/span><\/li>\n<\/ol>\n<p><span data-contrast=\"auto\">If one point may be medicine to the ears of PM department but poison at the same time for operational team, this point is most probably picking on the basis of the PM orders or reservations. Inability to do so consistently and correctly is the reason for delay and incorrect dispensing.<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<ol>\n<li aria-setsize=\"-1\" data-leveltext=\"%1.\" data-font=\"\" data-listid=\"3\" data-list-defn-props=\"{&quot;335552541&quot;:0,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769242&quot;:[65533,0],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;%1.&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" data-aria-posinset=\"3\" data-aria-level=\"1\"><span data-contrast=\"none\">Packing and Kitting Challenges<\/span><span data-ccp-props=\"{&quot;134245418&quot;:true,&quot;134245529&quot;:true,&quot;335559738&quot;:160,&quot;335559739&quot;:80}\">\u00a0<\/span><\/li>\n<\/ol>\n<p><span data-contrast=\"auto\">The reason(s) why the components may require the specific operations may not be that they are explicitly for certain procedures, but because they are not right packed or kitted, and that leads to the breaking of the maintenance schedule chain.<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<ol>\n<li aria-setsize=\"-1\" data-leveltext=\"%1.\" data-font=\"\" data-listid=\"3\" data-list-defn-props=\"{&quot;335552541&quot;:0,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769242&quot;:[65533,0],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;%1.&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" data-aria-posinset=\"4\" data-aria-level=\"1\"><span data-contrast=\"none\">Return Handling Complexity<\/span><span data-ccp-props=\"{&quot;134245418&quot;:true,&quot;134245529&quot;:true,&quot;335559738&quot;:160,&quot;335559739&quot;:80}\">\u00a0<\/span><\/li>\n<\/ol>\n<p><span data-contrast=\"auto\">A workshop is a place for perfection, however, in some cases, there the defects may be hidden, like the lack of proper tracking for the returned items, which is causing inventory discrepancies.<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<ol>\n<li aria-setsize=\"-1\" data-leveltext=\"%1.\" data-font=\"\" data-listid=\"3\" data-list-defn-props=\"{&quot;335552541&quot;:0,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769242&quot;:[65533,0],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;%1.&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" data-aria-posinset=\"5\" data-aria-level=\"1\"><span data-contrast=\"none\">Order Rescheduling Conflicts<\/span><span data-ccp-props=\"{&quot;134245418&quot;:true,&quot;134245529&quot;:true,&quot;335559738&quot;:160,&quot;335559739&quot;:80}\">\u00a0<\/span><\/li>\n<\/ol>\n<p><span data-contrast=\"auto\">Changes that occur in PM orders are not reflected in warehouse planning that result in the mismatch of the two.<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">The points only underlined the necessity for having an SAP PM and EWM combined process that is not only a structured one but also automated and connects the flow of the maintenance orders in SAP PM with the outbound delivery and goods issue in SAP EWM.<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<h2 aria-level=\"3\"><span data-contrast=\"none\">Solution: SAP EWM Process Flow for Maintenance Orders<\/span><span data-ccp-props=\"{&quot;134245418&quot;:true,&quot;134245529&quot;:true,&quot;335559738&quot;:160,&quot;335559739&quot;:80}\">\u00a0<\/span><\/h2>\n<p><span data-contrast=\"auto\">Firstly, let&#8217;s see the proper sequence of a tightly bonded SAP EWM-PM process:<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<ul>\n<li aria-setsize=\"-1\" data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"2\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" data-aria-posinset=\"1\" data-aria-level=\"1\"><span data-contrast=\"auto\">Maintenance Order Creation in SAP PM<\/span><br \/>\n<span data-contrast=\"auto\">Personally, I would take my first step towards PM if I had to create an order for some particular material (e.g., Material 2585).<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/li>\n<\/ul>\n<ul>\n<li aria-setsize=\"-1\" data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"2\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" data-aria-posinset=\"2\" data-aria-level=\"1\"><span data-contrast=\"auto\">Outbound Delivery (OBD) Creation in ERP<\/span><br \/>\n<span data-contrast=\"auto\">According to the system, an OBD that is linked to the maintenance order will be generated.<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/li>\n<\/ul>\n<ul>\n<li aria-setsize=\"-1\" data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"2\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" data-aria-posinset=\"3\" data-aria-level=\"1\"><span data-contrast=\"auto\">Warehouse Task Generation in SAP EWM<\/span><\/li>\n<li aria-setsize=\"-1\" data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"2\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" data-aria-posinset=\"3\" data-aria-level=\"1\"><span data-contrast=\"auto\">A warehouse task is initiated to obtain the selected quantity from the merchandise.<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/li>\n<\/ul>\n<ul>\n<li aria-setsize=\"-1\" data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"2\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" data-aria-posinset=\"4\" data-aria-level=\"1\"><span data-contrast=\"auto\">Picking Confirmation<\/span><br \/>\n<span data-contrast=\"auto\">The warehouse task confirmation is the moment of accomplishment when the materials are moved to the GI zone.<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/li>\n<\/ul>\n<ul>\n<li aria-setsize=\"-1\" data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"2\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" data-aria-posinset=\"5\" data-aria-level=\"1\"><span data-contrast=\"auto\">Packing and Loading (Optional)<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/li>\n<\/ul>\n<p><span data-contrast=\"auto\">\u00a0 \u00a0 \u00a0 \u00a0Materials are packaged and prepared for the shipment, in case, it is planned.<\/span><span data-ccp-props=\"{&quot;335559685&quot;:720}\">\u00a0<\/span><\/p>\n<ul>\n<li aria-setsize=\"-1\" data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"2\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" data-aria-posinset=\"6\" data-aria-level=\"1\"><span data-contrast=\"auto\">Goods Issue Against Maintenance Order<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/li>\n<\/ul>\n<p><span data-contrast=\"auto\">The very last step for the goods issue to be accounted for is in SAP EWM, thus, the maintenance order and inventory records get updated accordingly.<\/span><span data-ccp-props=\"{&quot;335559685&quot;:720}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">The outlined steps provide a guarantee for utmost transparency of the on-hand goods, accurate inventory records, and seamless cooperation between maintenance and warehouse teams.<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignnone size-full wp-image-25055\" src=\"https:\/\/gtracademy.org\/wp-content\/uploads\/2025\/12\/0753e65e-9c8d-49e4-acb6-74261ed477e5.webp\" alt=\"SAP\u200b\u200d\u200b\u200c\u200d\u200b\u200d\u200c\u200b\u200d\u200b\u200c\u200d\u200b\u200d\u200c EWM + PM Integration\" width=\"800\" height=\"450\" srcset=\"https:\/\/gtracademy.org\/staging\/wp-content\/uploads\/2025\/12\/0753e65e-9c8d-49e4-acb6-74261ed477e5.webp 800w, https:\/\/gtracademy.org\/staging\/wp-content\/uploads\/2025\/12\/0753e65e-9c8d-49e4-acb6-74261ed477e5-300x169.webp 300w, https:\/\/gtracademy.org\/staging\/wp-content\/uploads\/2025\/12\/0753e65e-9c8d-49e4-acb6-74261ed477e5-768x432.webp 768w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/p>\n<h2 aria-level=\"2\"><strong><span style=\"font-size: 18pt;\">Connect With Us:<a href=\"https:\/\/api.whatsapp.com\/send\/?phone=919650518049&amp;text=Hi%2C%20I%20want%20to%20know%20more%20about%20GTR%20academy%20courses\" target=\"_blank\" rel=\"noopener\"><span style=\"color: #339966;\"> WhatsApp<\/span><\/a><\/span><\/strong><\/h2>\n<h2 aria-level=\"2\"><span data-contrast=\"none\">Conclusion: Why This Integration Matters?<\/span><span data-ccp-props=\"{&quot;134245418&quot;:true,&quot;134245529&quot;:true,&quot;335559738&quot;:160,&quot;335559739&quot;:80}\">\u00a0<\/span><\/h2>\n<p><span data-contrast=\"auto\">The fusion of <a href=\"https:\/\/gtracademy.org\/sap-ewm-online-training-with-certification\/\"><strong>SAP EWM<\/strong><\/a> and <a href=\"https:\/\/gtracademy.org\/sap-tm-training-master-s-4hana-course\/\"><strong>PM technology<\/strong><\/a> doesn\u2019t merely represent a tech ensemble but rather a strategic tool that can be used to great effect. It allows:<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<ul>\n<li aria-setsize=\"-1\" data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"2\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" data-aria-posinset=\"7\" data-aria-level=\"1\"><span data-contrast=\"auto\">Maintenance tasks to be completed in less time<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/li>\n<\/ul>\n<ul>\n<li aria-setsize=\"-1\" data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"2\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" data-aria-posinset=\"8\" data-aria-level=\"1\"><span data-contrast=\"auto\">Inventory being tracked right<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/li>\n<\/ul>\n<ul>\n<li aria-setsize=\"-1\" data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"2\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" data-aria-posinset=\"9\" data-aria-level=\"1\"><span data-contrast=\"auto\">Downtime dropped<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/li>\n<\/ul>\n<ul>\n<li aria-setsize=\"-1\" data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"2\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" data-aria-posinset=\"10\" data-aria-level=\"1\"><span data-contrast=\"auto\">Compliance and auditability improved<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/li>\n<\/ul>\n<ul>\n<li aria-setsize=\"-1\" data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"2\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" data-aria-posinset=\"11\" data-aria-level=\"1\"><span data-contrast=\"auto\">MRO JIT logistics streamlined<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/li>\n<\/ul>\n<p><b><span data-contrast=\"auto\">In which way GTR Academy is beneficial?<\/span><\/b><span data-ccp-props=\"{&quot;335559685&quot;:360}\">\u00a0<\/span><\/p>\n<ul>\n<li aria-setsize=\"-1\" data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"4\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" data-aria-posinset=\"1\" data-aria-level=\"1\"><span data-contrast=\"auto\">On-the-job lab exercises for SAP EWM outbound delivery and goods issue<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/li>\n<\/ul>\n<ul>\n<li aria-setsize=\"-1\" data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"4\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" data-aria-posinset=\"2\" data-aria-level=\"1\"><span data-contrast=\"auto\">Real-world scenarios for PM order processing and warehouse task confirmation<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/li>\n<\/ul>\n<ul>\n<li aria-setsize=\"-1\" data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"4\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" data-aria-posinset=\"3\" data-aria-level=\"1\"><span data-contrast=\"auto\">Training in the execution of picking, packing, and staging tasks<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/li>\n<\/ul>\n<ul>\n<li aria-setsize=\"-1\" data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"4\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" data-aria-posinset=\"4\" data-aria-level=\"1\"><span data-contrast=\"auto\">Support in the process of handling returns and rescheduling orders<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/li>\n<\/ul>\n<p><span data-contrast=\"auto\">\ud83d\udc49<\/span><span data-contrast=\"auto\"> Do you want to become proficient in SAP EWM-PM integration? <\/span><br \/>\n<strong>\u00a0<\/strong><br \/>\n<span data-contrast=\"auto\"><a href=\"https:\/\/gtracademy.org\/\"><strong>GTR Academy&#8217;s <\/strong><\/a>SAP EWM training is the perfect way to achieve this goal and thus become the sought-after expert for warehouse and maintenance \u200b\u200d\u200b\u200c\u200d\u200b\u200d\u200c\u200b\u200d\u200b\u200c\u200d\u200b\u200d\u200ccoordination.<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Why SAP EWM and PM Must Work Together?\u00a0 Plant Maintenance (SAP PM) and Extended Warehouse Management (SAP EWM) are the two critical departments that must be in harmony for the success of the sectors, SAP\u200b\u200d\u200b\u200c\u200d\u200b\u200d\u200c\u200b\u200d\u200b\u200c\u200d\u200b\u200d\u200c EWM + PM Integration industrial complex manufacturing, and asset-intensive industries. Spare parts, tools, and kits are the necessary items for&#8230;<\/p>\n","protected":false},"author":5,"featured_media":25055,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_kad_post_transparent":"default","_kad_post_title":"default","_kad_post_layout":"default","_kad_post_sidebar_id":"","_kad_post_content_style":"default","_kad_post_vertical_padding":"default","_kad_post_feature":"","_kad_post_feature_position":"","_kad_post_header":false,"_kad_post_footer":false,"_kad_post_classname":"","footnotes":""},"categories":[20],"tags":[2509,2511,2512,2513,2510],"class_list":["post-25047","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-sap","tag-sap-ewm","tag-sap-ewm-pm-integration","tag-sap-maintenance-order","tag-sap-outbound-delivery","tag-sap-pm"],"_links":{"self":[{"href":"https:\/\/gtracademy.org\/staging\/wp-json\/wp\/v2\/posts\/25047","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/gtracademy.org\/staging\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/gtracademy.org\/staging\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/gtracademy.org\/staging\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/gtracademy.org\/staging\/wp-json\/wp\/v2\/comments?post=25047"}],"version-history":[{"count":0,"href":"https:\/\/gtracademy.org\/staging\/wp-json\/wp\/v2\/posts\/25047\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/gtracademy.org\/staging\/wp-json\/wp\/v2\/media\/25055"}],"wp:attachment":[{"href":"https:\/\/gtracademy.org\/staging\/wp-json\/wp\/v2\/media?parent=25047"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/gtracademy.org\/staging\/wp-json\/wp\/v2\/categories?post=25047"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/gtracademy.org\/staging\/wp-json\/wp\/v2\/tags?post=25047"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}