SAP EWM + PM Integration: Streamlining Goods Issue for Maintenance Orders Best 2025
Why SAP EWM and PM Must Work Together?
Plant Maintenance (SAP PM) and Extended Warehouse Management (SAP EWM) are the two critical departments that must be in harmony for the success of the sectors, SAP EWM + PM Integration industrial complex manufacturing, and asset-intensive industries. Spare parts, tools, and kits are the necessary items for the maintenance teams, so they have to be granted an uninterrupted access, while the warehouse teams continuously juggle inventory, picking, packing, and issuing materials in a flawless manner, SAP EWM + PM Integration.
The link between SAP EWM and SAP PM opens the way for a friendly interaction between maintenance orders and warehouse logistics. It is basically a flow from order creation to goods issue, which helps to ensure that the right materials meet the right place at the right time without the intervention of the human factor and without mistakes or delays.
At GTR Academy, we sharpen the skills of SAP integration experts, thereby, giving them the ability to MRO (Maintenance, Repair, and Operations) workflow optimization and plant downtime reduction.
Connect With Us: WhatsApp
Challenge: Common Pain Points in EWM-PM Integration
The absence of a proper integration between the hard and software systems can slow down the operational nitty-gritty progressively in all levels and departments of a corporation. Now, let me briefly describe the typical scenarios and situations when things take a turn for the worse:
- MRO Inventory Mismanagement
On many occasions, maintenance teams are confused when it comes to finding the location of parts or making a reservation of them in a warehouse that is under the management of EWM.
- Manual Picking Errors
If one point may be medicine to the ears of PM department but poison at the same time for operational team, this point is most probably picking on the basis of the PM orders or reservations. Inability to do so consistently and correctly is the reason for delay and incorrect dispensing.
- Packing and Kitting Challenges
The reason(s) why the components may require the specific operations may not be that they are explicitly for certain procedures, but because they are not right packed or kitted, and that leads to the breaking of the maintenance schedule chain.
- Return Handling Complexity
A workshop is a place for perfection, however, in some cases, there the defects may be hidden, like the lack of proper tracking for the returned items, which is causing inventory discrepancies.
- Order Rescheduling Conflicts
Changes that occur in PM orders are not reflected in warehouse planning that result in the mismatch of the two.
The points only underlined the necessity for having an SAP PM and EWM combined process that is not only a structured one but also automated and connects the flow of the maintenance orders in SAP PM with the outbound delivery and goods issue in SAP EWM.
Solution: SAP EWM Process Flow for Maintenance Orders
Firstly, let’s see the proper sequence of a tightly bonded SAP EWM-PM process:
- Maintenance Order Creation in SAP PM
Personally, I would take my first step towards PM if I had to create an order for some particular material (e.g., Material 2585).
- Outbound Delivery (OBD) Creation in ERP
According to the system, an OBD that is linked to the maintenance order will be generated.
- Warehouse Task Generation in SAP EWM
- A warehouse task is initiated to obtain the selected quantity from the merchandise.
- Picking Confirmation
The warehouse task confirmation is the moment of accomplishment when the materials are moved to the GI zone.
- Packing and Loading (Optional)
Materials are packaged and prepared for the shipment, in case, it is planned.
- Goods Issue Against Maintenance Order
The very last step for the goods issue to be accounted for is in SAP EWM, thus, the maintenance order and inventory records get updated accordingly.
The outlined steps provide a guarantee for utmost transparency of the on-hand goods, accurate inventory records, and seamless cooperation between maintenance and warehouse teams.

Connect With Us: WhatsApp
Conclusion: Why This Integration Matters?
The fusion of SAP EWM and PM technology doesn’t merely represent a tech ensemble but rather a strategic tool that can be used to great effect. It allows:
- Maintenance tasks to be completed in less time
- Inventory being tracked right
- Downtime dropped
- Compliance and auditability improved
- MRO JIT logistics streamlined
In which way GTR Academy is beneficial?
- On-the-job lab exercises for SAP EWM outbound delivery and goods issue
- Real-world scenarios for PM order processing and warehouse task confirmation
- Training in the execution of picking, packing, and staging tasks
- Support in the process of handling returns and rescheduling orders
👉 Do you want to become proficient in SAP EWM-PM integration?
GTR Academy’s SAP EWM training is the perfect way to achieve this goal and thus become the sought-after expert for warehouse and maintenance coordination.
I am a skilled content writer with 5 years of experience creating compelling, audience-focused content across digital platforms. My work blends creativity with strategic communication, helping brands build their voice and connect meaningfully with their readers. I specialize in writing SEO-friendly blogs, website copy, social media content, and long-form articles that are clear, engaging, and optimized for results.
Over the years, I’ve collaborated with diverse industries including technology, lifestyle, finance, education, and e-commerce adapting my writing style to meet each brand’s unique tone and goals. With strong research abilities, attention to detail, and a passion for storytelling, I consistently deliver high-quality content that informs, inspires, and drives engagement.

